August 4th 2018.
Work begins by tearing out the interior and removing the rear panel to assess what works need doing.
 Debri from the hardboard walls being removed. |  The rear panel had to be removed to see the extent of the damage from being submerged in mud for year. It's quite extensive. |  More hardboard debri |
---|
 This is the A frame end of the unit. It has a small half door which we will need to extend to a full door. It's more likely we will put a door somewhere else. |  Some rust damage beneath one of the shutters. This will need welding but not too serious. All structurally sound. |  Some rust damage beneath one of the shutters. This will need welding but not too serious. All structurally sound. |
---|
 Debri from the hardboard walls being removed. |  The centre of the rear strut water damage. |  The rear lower strut has almost all eroded away. |
---|
 As well as eroding the metal strut, the wooden floor has also rotted away. The whole floor will be replaced with new marine ply. |  The rear lower strut has almost all eroded away. |  Floor and strut damage. This all needs welding. |
---|